XIMI TECHNOLOGY LIMITED518000About UsB515, NIULANQIAN BUILDING, MINZHI STREET, LONGHUA DISTRICT, SHENZHEN, CHINAShenzhen XIMI TECHNOLOCY LIMITED is a global provider for biometric and security products contain with time attendance, access control, smart door lock, turnstiles, video door phone and smart home systems. Your security, our responsibility, guides us and pushes us forward.The strict quality guarantee system,perfect management system, high- quality products and good after-sales service is our foothold in this field,  "Quality First,Reputation First" is our company principle.      •Our Vision: To be one of the leader in biometric and security field.   •Our Mission: Make the value to be largest for the customers.   •

Suitable for access control with light indication stainless steel push button switch exit button
Suitable for access control with light indication stainless steel push button switch exit button
Suitable for access control with light indication stainless steel push button switch exit button
Suitable for access control with light indication stainless steel push button switch exit button
Suitable for access control with light indication stainless steel push button switch exit button
Suitable for access control with light indication stainless steel push button switch exit button
Suitable for access control with light indication stainless steel push button switch exit button
Suitable for access control with light indication stainless steel push button switch exit button

Suitable for access control with light indication stainless steel push button switch exit button

Model NO.:E01
USD1.00-USD5.50
  • DeliveryFOB
  • Minimum order quantity10 pieces
  • Supply Ability100000 pieces / Month
  • Country of OriginShenzhen
  • Stock Time3-30 Days
  • Categories: Exit button
    • Place of Origin:CN;GUA
    • Model Number:E01
    • Brand Name:XIMI
    • Protection Level:3
    • Contact Rating:DC36V,3A
    • Output Contact:COM/NO
    • Log capacity:100000
    • Mechanical Life:500000 tested
    • Suitable for Door:Hollow Door
    • Operating temperature:10~+55°C(14-131F)

    Features

    1. Press to exit
    2. Standard structure: stainless steel panel with strongly style and stainless steel button
    3. Current rating: 3A 36V DC maximum with NO/COM
    4. Size: 91*28*20(mm)
    5. Applicable to hollow door and concealing box
    6. Quality guarantee: one year

    Specifications

    Dimensions

    91*28*20(mm)

    Input

    DC12V

    Contact Rating

    DC36V,3A

    Output Contact

    COM/NO

    Mechanical Life

    100000 tested

    Suitable for Door

    Hollow Door

    Operating temp

    10~+55°C(14-131F)

    Operating Humidity

    0-95% (non- condensing)

    Weight

    0.1kg

    Standard Packing

    100pcs.

    Images

    007.jpg



     







    • Model Number:E01
    • Brand Name:Ximiir
    • Place of Origin:China

    Send Message

    Preview on Mobile
    X
    customer-service Customer Service
    whatsapp WhatsApp
    skype Skype
    wechat WeChat
    message Message
    go top Top
    WeChat Close
    qr code
    008613823594450
    qrcode

    Send Message

    *
    * clear input
    Choose language